September 7, 2019 Work Day A big Success

Posted on September 4, 2019

The Range Construction Directors want to thank the 28 people who came out to the Work Day today. Fantastic bunch!!! We got almost everything done on our wish list for the day.

Lots of work available for the Sept 7th work day. Jobs include:

Clubhouse Tasks:

  • Mop and clean bathrooms
  • Sweep and vacuum clean floors and rugs
  • Clean Indoor Range viewing area and around shooting tables
  • Removal of all trash from trash containers and deposit in dumpster
  • Mop and clean kitchen floor
  • Wash and clean windows
  • Clean gutters

General Range Tasks:

  • Sweep up around shooting benches
  • Check and repair Main Range targets
  • Pick up all brass
  • Empty all trash containers and deposit in dumpster
  • Grease shooting bench seats
  • Move 2 new gun racks to the Main Range (Take bad ones to the burn pile behind the 100-Y Range)
  • Fill sand/salt buckets in salt sheds

Parking Lot and all remaining Ranges Tasks:

  • Pick up all debris/paper and deposit in dumpster
  • Empty all trash containers and deposit in dumpster
  • Trim weeds around cement barrier on roadway to the Back Range
  • Cut grass and trim weeds on the 500-M Back Range
    • Weed the berm of the 200-M and 300-M
  • Repair and replace 4 x 4 posts on 100-Y Range outback
  • Check target frames on 100-Y, 200-M, 300-M, 500-M

Painting (Paint is in the Clubhouse storage room shelf)

  • Paint 500-M Shooting Hut
  • Paint East-bay Range Shooting Hut
  • Paint the multi-gun storage container
  • Stain Archery Range raised shooting platform

Garage

  • Clean the garage (Put all excess wood in storage behind the100-Y Range on the Main Range)
  • Finish building shooting bench for Outback Ranges

» Filed Under Uncategorized

Comments

Comments are closed.

  • Recent News

  • News by Subject

  • Post Archive